     24.  POLICY FOR CONSTRUCTION OF NEW RECEIPT OR DELIVERY FACILITIES
   
       All requests for new interconnects must be made in writing.  Unless
Transporter agrees otherwise, the party requesting the new interconnect shall
reimburse MIGC or cause MIGC to be reimbursed for any and all reasonable
costs and expenses incurred in constructing, establishing or modifying the
facilities required to establish a new interconnection on existing facilities
for receipt or delivery of Gas hereunder.  Any agreement by Transporter to bear
all or a portion of new interconnect costs shall be done because such
construction is economically or operationally beneficial to Transporter and
Shippers, shall be done in a not unduly discriminatory manner and shall be
exercised in Transporter's reasonable discretion.   In this regard, all new
receipt and delivery meters shall require EGM which shall be owned by MIGC and
all new delivery meters shall require a Flow Control Device with pressure
override features that can be remotely operated by MIGC.  MIGC also must be the
custody transfer party at the proposed facility.
   
       In addition to the above requirements, MIGC will agree to construct a
new interconnect or modify an existing interconnect on the following terms:
   
    (1)  The construction of the new interconnect will not create any
significant operational problems for MIGC;
   
    (2)  The proposed interconnect will not adversely affect the rendi-
tion of existing service or adversely alter the operation of the pipeline
system;
   
    (3)  The new interconnect must be at a mutually agreeable location
on the MIGC system; provided, however, that MIGC may not deny a customer's
request for specific placement of the interconnect without adequate
operational, environmental, or legal justification;
   
    (4)  In order to properly and prudently design and size the new
interconnect, MIGC must be provided with reasonable and reliable data
concerning the interconnecting facilities, including the delivery pressures,
and anticipated hourly, daily, monthly and annual volume levels of the service
that supports the new interconnect and such other data as is reasonably
required to construct the interconnect facility;







Issued by: