| MIGC LLC | Third Revised Sheet No. 6 : Effective | |
| FERC Gas Tariff | Supersedes Second Revised Sheet No. 6 | |
| MIGC LLC | ||
FUEL RETENTION AND LOSS PERCENTAGE FACTORS The rates set forth on Sheet No. 4 are exclusive of fuel use requirements. Pursuant to Section 25 of the General Terms and Conditions contained herein, Shipper shall reimburse MIGC for its applicable fuel use requirements. Such reimbursement shall be furnished in-kind. Transportation provided solely by Backhaul shall not incur a fuel charge, but is required to provide in-kind reimbursement for losses of 0.26%. The fuel use reimbursement furnished by shippers, for gas entering the MIGC system at the following pressures shall be as follows: Current Base Current Total FL&U Factor Surcharge FL&U Factor FL&U Greater than 1.65% -0.27% 1.38% 1.38% or equal to 350 psig* Less than 350 psig 13.42% 4.90% 18.32% 19.70% The fuel use factors set forth above shall be calculated and adjusted as explained in Section 25 of the General Terms and Conditions. * includes all interconnections with other interstate and intrastate pipelines.
| Issued by: | ||
| Issue date: | Effective date: 08/01/10 | |