6/1/13-5/31/16: Primary Delivery Point(s) WBI REcluse 6,000 MMBtu and WIC-Antelope 6,000 MMBtu. Secondary receipt points of TGI Glenrock 6,000 MMBtu, CIG Powder River 6,000 MMBtu. Primary Delivery Point Contract MDQs: CLFP Rawhide 4344 MMBtu; CLFP Dopplebach 549 MMBtu; CLFP City Gate 6 900 MMBtu; CLFP Wright 207 MMBtu. The sum of all receipt and delivery points shall not exceed the transportation contract demand. The discounted rate is for transportation between the primary receipt and delivery points only.
For 6/1/13-5/31/16, Shipper shall pay to MIGC for natural gas transportation service rendered during each monthly billing period a Reservation Charge based upon the following formula:
RC = A x ($10.515 x B)/(30.4167 x A)
Where:
“RC” is the Reservation Charge;
“A” is the Shipper’s Transportation Contract Demand specified on Exhibit A; and
“B” is the quantity of natural gas in MMBtu delivered to MIGC by Shipper at the Receipt Point(s) during the month net of any Authorized Overrun volumes.
In no event will the calculated demand rate of ($10.515 x B)/(30.4167 x A) be greater than the maximum Demand Rate nor less than the minimum Demand Rate for FTS-1 Firm Transportation Service as set forth in Part 4 of the effective Tariff.
Additionally, Shipper shall pay MIGC the Currently Effective Tariff Rate maximum Commodity Rate per MMBtu as set forth under MIGC’s FTS-1 rate schedule in Part 4 of the effective Tariff for the quantity of natural gas delivered to MIGC by Shipper at the Receipt Point(s). The ACA charge will be assessed as specified in Part 5 of the effective Tariff. The Fuel Reimbursement Charge will be assessed as specified in Part 6 of the effective Tariff. Authorized Overrun volumes (volumes transported in excess of Shipper’s Transportation Contract Demand) will be charged as specified in Section 8.6 of the effective Tariff.
|