| MIGC LLC |
|
Original Sheet No. 88 : Effective |
| FERC Gas Tariff |
|
|
| MIGC LLC |
TRANSPORTATION GENERAL TERMS AND CONDITIONS
(Continued)
(ii) The Releasing Shipper shall provide capacity
recall notification to its affected Replacement Shipper(s) at the same time it
provides notification to MIGC. The recall notification shall specify the
recall notification period for the specified effective gas day, as well as any
other information needed to uniquely identify the capacity being recalled. The
mode of notification shall be mutually agreed upon between the Releasing and
Replacement Shippers.
(iii) All recalled capacity notices shall indicate
whether penalties will apply for the gas day for which quantities
are reduced due to a capacity recall.
(h) Allocation of Quantities
In the event of an intra-day capacity recall, MIGC
shall determine the allocation of capacity between the Releasing Shipper and
the Replacement Shipper(s) based upon the Elapsed Prorata Capacity (EPC).
Variations to the use of EPC may be necessary to reflect the nature of the
MIGC Tariff, services, and/or operational characteristics. For any recall
notification provided to MIGC, the quantity shall be expressed in terms of the
adjusted total released capacity entitlements based upon the EPC. EPC means
that portion of the capacity that would have theoretically been available for
use prior to the effective time of the intraday recall based upon a cumulative
uniform hourly use of the capacity. The amount of capacity allocated to the
Replacement Shipper(s) shall equal the original released capacity less the
recalled capacity that is adjusted based upon the EPC. MIGC shall not be
obligated to deliver in excess of the total daily contract quantity of the
release as a result of any recall.
(j) Disputes
In the event of a dispute between the Releasing Shipper
and any other person as to the validity of any recall, or the status of the
holder of capacity rights, MIGC shall be entitled to conclusively rely on any
notice provided by the Releasing Shipper. The original Shipper and/or any
Replacement Shipper(s) involved in any such dispute shall indemnify and hold
MIGC harmless from any costs, damages or expenses relating to MIGC's reliance
on such notice.
8. Reputs of Recalled Capacity
MIGC shall support the function of the reputting of capacity by a
Releasing Shipper. The deadline for notifying MIGC of a reput is 8:00 a.m. CCT
(7:00 a.m. MCT) to allow for timely nominations to flow on the next gas day.
When capacity is recalled, it may not be reput for the same Gas Day.
| Issued by: |
| Issue date: |
|
Effective date: 08/01/08 |